• APEM Home
  • What we do
    • Water Quality
    • Fisheries Science
    • Sediment
    • Macrophyte Ecology
    • Macroinvertebrates
    • Plankton Studies
    • Modelling
    • Policy and Regulation
    • Habitat Evaluation
    • Biodiversity
    • Conservation
    • Other Ecological Services
  • Team
  • Vacancies
  • Out and about
  • Important news
  • Contact us
  • Feedback
Choose section
projects

Listed below are some of the projects that APEM have been involved with since its founding in 1987. If you are interested in APEM's specific capabilities then you can navigate to projects relating to particular areas more easily through What We Do and associated pages.

  • Barrow-in-Furness
  • Bourne Rivulet
  • BTC Oil Pipeline Project
  • Eden Rivers Trust Electric Fishing Survey Design
  • Heathrow Terminal 5
  • Irwell River Corridor
  • Lamprey in the Rivers Spey and Tay
  • Liverpool Canal and Docks Extension
  • Manchester Ship Canal
  • Mersey Estuary Bridge Crossing
  • North West Adult Salmonid Migration & Flow Studies
  • Possible Ecological Impacts of Flow Augmentation on the River Exe and its Principle Tributaries.
  • River Bann
  • River Bollin Salmonids
  • River Cam EIA
  • River Darent Crayfish
  • River Eden Abstraction
  • River Haddeo
  • River Hodder
  • River Irwell
  • River Lochy Abstraction
  • River Otter
  • River Teifi Macroinvertebrates
  • Rivers Leven and Eamont
  • SAC River Sampling for Lamprey and Bullhead
  • Sakhalin Island Pipeline Crossing
  • Salford Quays Bacterial Monitoring
  • Salford Quays Water Quality and Fisheries
  • Salmon Restoration Manual
  • Six Mile Water
  • Spined Loach
  • Sustainable River Management Project
  • Swinden Quarry EIA
  • Tamar Lakes Eutrophication Project
  • Upper Manchester Ship Canal Turning Basin
  • Walkover Survey of the Rivers Derwent, South Tyne and Tees
  • Wimbleball Fish
  • Wimbleball Invertebrates
  • Yorkshire Water UID